Case Study: Efficient Concrete Delivery for Roadworks in Wandsworth

Key Takeaways

  • Efficient Delivery: Rapid Readymix delivered 2m³ of C40 concrete efficiently between two sites along the same road within a tight timeframe.
  • Technical Precision: We met strict technical requirements ensuring that the concrete had sufficient curing time, crucial for the subsequent tarmac laying.
  • Adaptability in Challenges: The team overcame significant logistical challenges, including restricted site access and inadequate equipment, through expert navigation and additional resources.
  • Reliable Partnership: Rapid Readymix cemented our reputation as a reliable concrete supplier by consistently meeting the needs of a major ongoing infrastructure project across South London.
  • Strategic Use of Technology: We utilised our AGGSMART shipping system and GPS technology to navigate effectively around road closures and ensure timely arrival at the job site.

Introduction to the Project

Rapid Readymix recently completed a critical concrete delivery project for ongoing road reinstatement work in Wandsworth, South London. Using one of our  volumetric mixers, the Rapid Readymix team efficiently managed the offloading process via wheelbarrow, demonstrating precision and adaptability under tight time constraints.

person looking behind while driving rapid readymix volumetric mixer truck

Project Background

Rapid Readymix has cultivated a robust partnership with this client, consistently delivering high-quality concrete for numerous vital projects across South London. Since the beginning of the year, our collaboration has extended to over 20 significant assignments as part of a comprehensive Thames Water initiative, aimed at upgrading and maintaining essential infrastructure. 

This ongoing series of projects not only demonstrates our capability to meet varied and demanding requirements but also highlights our commitment to supporting regional development. Each assignment has presented its own set of unique challenges—from managing last-minute schedule changes to navigating tight urban spaces—which Rapid Readymix has adeptly navigated with precision and adaptability. 

The choice of C40 concrete, known for its durability and high performance, underscores our dedication to quality and our technical expertise in selecting materials that match the critical nature of infrastructure work. Furthermore, our proactive approach in adapting logistical strategies and leveraging cutting-edge technology like AGGSMART and GPS navigation ensures that we consistently overcome environmental and urban constraints. 

This strong foundation of trust and performance has made Rapid Readymix a preferred partner for projects that contribute to the city’s safety and functionality, reinforcing our role in shaping a resilient urban landscape.

Concrete Delivery Requirements

For the Wandsworth project, the client required 2m³ of C40 concrete, delivered to two sites along the same road between 10am and 12pm. The timely delivery was crucial to meet strict technical requirements set by Thames Water, ensuring sufficient curing time before subsequent tarmac laying by another team.

Navigating Constraints and Challenges

The project needed to be carried out to a strict schedule, as the permit for the road closure was nearing expiration, and the tarmac layers were scheduled to arrive shortly after the concrete placement. Unexpectedly, the team encountered plastic trench covers and a deep excavation on-site, which prevented the mixer lorry from parking close to the required offloading points. Additionally, the site team was under-equipped with only one wheelbarrow, complicating the concrete transfer process.

Techniques and Tools Employed

Our driver leveraged our AGGSMART shipping system integrated into his TomTom tablet to navigate effectively around multiple nearby road closures, arriving at the site with only a minor delay. Despite the access challenges, the driver’s expert judgement prevented potential accidents by avoiding driving over inadequate trench covers. Furthermore, our volumetric mixers are equipped with additional wheelbarrows, making the offloading process much quicker and easier for the onsite team.

Project Conclusion and Client Feedback

Despite the initial hurdles, all concrete was successfully placed within 45 minutes, well within the critical time frame that had been established by the client. The tarmac was laid a few days later, and the road reopened smoothly without any issues. This project not only underscored Rapid Readymix’s commitment to delivering high-quality ready mix concrete under tight deadlines but also reinforced our status as a trusted supplier for major infrastructure projects. We continue to support our client across various sites, ensuring each project concludes successfully with precision and reliability.

This case study illustrates Rapid Readymix’s capabilities in managing complex logistical challenges and delivering quality concrete solutions efficiently. Our team’s expertise and the strategic use of technology ensure that we meet client expectations consistently, even under strict constraints.